• Home
  • About
    • Careers
    • Team
  • Academics
    • Academic Calendar
    • Elementary School
    • Senior High
      • Senior Information
    • RISE Program
    • Part time Students
  • Athletics
    • Schedules
  • Fine Arts
    • Schedule
  • Calendar
  • Campus Life
  • Store
  • News & Blogs
  • Admissions
  • Contact us
  • Parent Dashboard
APPLY NOW
Front Range Christian SchoolFront Range Christian School
Front Range Christian SchoolFront Range Christian School
  • About
  • Admissions
  • Academics
  • Giving
  • Calendar
  • News and Blogs
  • Contact us
  • Parent Dashboard

The Nehemiah Project

Currently Underway & Coming Soon

  • Initial stadium fencing upgrade
  • In ground picnic tables and benches around campus

Current Needs

  • LulzBot Taz 6 3D printer (new or used in great condition)
  • LulzBot Mini 2 3D printer (new or used in great condition)
  • Enclosures for these 3D printers
  • 4 Lego WeDo 2.0 kits
  • Financial support of any amount

Give a Gift

Prayer Requests

  • How you might play a role in The Nehemiah Project
  • Provision
  • For donations of equipment for the Genesis Center (including 3D printers, WeDo 2.0 Lego Robotics kits, and more)
  • Protection for those involved in the work and for God’s blessing on efficiency
  • Leadership
  • Obedience to God’s calling

Milestones

  • Perimeter fencing and gates complete
  • Second team room in the Athletic Building is complete
  • A metal shop has been created as part of the GC in the adjacent loading dock area
  • Completed the Genesis Center (GC)
  • Team Room completed
  • Elementary upper playground completed
  • Remodel of the restrooms in the Commons completed
  • Completed the remodel of the Commons
  • The gym floor has been resurfaced

A Vision Being Fulfilled

Six years ago, a seed of a vision for Front Range Christian School was born. This vision both built on tradition, allowing for the hopes and dreams of what our school could be, as well as a driving need to propel the school into the future God intends. Through intense prayer, dreaming, planning, and what can only be called inspired revelation, The Nehemiah Project was born.

While the project is divided into three distinct phases, the overarching goals are the same for each phase:

  • Finish what was begun: We moved to this campus in 2002 (jr/sr high) and 2007 (elementary), but it has never been “finished”
  • Be good stewards of what we have been given: Our campus has been in a perpetual state of “patch and repair” — The Nehemiah Project focuses on replacing and improving
  • Provide for our students: These improvements cover a variety of areas and include improved security, space to create community, opportunity for growth (which in turn provides more opportunity for students)
  • Move closer to God’s vision for FRCS
  • Inspire students to be culture makers for Christ

The benefits are far reaching and range from increased school pride, a greater presence in the community at large, and increased enrollment which not only broadens the impact of the school but also allows FRCS to meet the needs of more students.

Phase 1

We are excited to announce that a great portion of Phase 1 has already been funded! Plans are well underway and work is already beginning on each project within Phase 1.

Commons Renovation

The Commons Renovation includes a complete renovation of the bathrooms, reconfiguring the entrance doors, building a breezeway, and creating a much-needed student center.

Genesis Center – COMPLETED

The Genesis Center is a new area that will allow students to create and work with their hands while providing space for STEM education and experiences. Features will include woodworking and metalworking areas, sewing areas, 3D printers, robotics station, collaboration areas, and so much more. It’s the ultimate invention center!

Stadium Facelift

Falcon Field will soon have a new, grand entrance. Details include signage to clearly and beautifully guide visitors to the field; attractive fencing that will increase pride and provide additional security; and garden space to welcome fans and visitors.

PAC Renovation Part 1

The Performing Arts Center is receiving several upgrades including a new, state of the art lighting system, sound paneling, and new sound equipment. These improvements will help us continue to offer excellence in our Fine Arts programs while paving the way for expanding the center in later phases.

Team Room – COMPLETED

The Athletic Building has great potential that has not yet been tapped. In Phase 1 of The Nehemiah Project, we will create team rooms, which will include lockers, a restroom, washer and dryer, and team meeting space.

Phases 2 & 3

Phases 2 and 3 will begin when Phase 1 is complete and as resources are available. We are already accepting contributions to The Nehemiah Project to begin Phases 2 and 3 as soon as possible. Projects for these phases include:

  • Double gym
  • Baseball field (for games and practices)
  • Campus quad
  • Junior high wing
  • Center for Christian Scholarship
  • Student Support Center expansion
  • PAC expansion
  • Property acquisition
  • And more!

Support FRCS

  • Home
  • Give a Gift
  • The Nehemiah Project
  • Give-Back Programs
  • Generosity for Generations
Front Range Christian School spirit logo

Front Range Christian School
Littleton CO 80128
Contact Information

©2021-2025 FRCS. All rights reserved.
Privacy policy | Anti-discrimination policy | Legal notices

QUICK LINKS

Family Handbook Athletics
Academic Calendar Fine Arts
Event Calendar Hot Lunches
School Hours News & Blog
Closures Staff Directory
Parent Dashboard  
ALUMNI CAREERS SUPPORT
FAMILY PORTAL   APPLY NOW

facebook logo instagram logo twitter logo youtube logo